top of page

Get in Touch

Discuss Your Project

Request a FREE no-obligation quote and let’s talk about how we can deliver your project safely, on time and to the highest standard.

Servicing Sydney, Central Coast, Newcastle, Wollongong and East Coast NSW.

© 2026 R.O. Steel Roofing | All Rights Reserved

Asbestos roof removal and replacement at Campbelltown Frames & Trusses

Project: Campbelltown Frames & Trusses Asbestos Removal & Roof Replacement

Case Study

Campbelltown
Frames & Trusses

Location:

Campbelltown

Size:

7,420 m²

Scope:

Asbestos removal, Roof Replacement & Wall Cladding

Challenge

7,420m² Asbestos Replacement Against a Fixed Shutdown Deadline

This large-scale project required the removal and replacement of approximately 7,420m² of asbestos roofing and wall cladding within the Christmas shutdown period. The works needed to be completed safely and efficiently so the site could resume normal operations with minimal delay.

Solution

Compliant Asbestos Removal & Full Roof, Cladding & Drainage Upgrade

R.O. Steel Roofing carried out the controlled removal and compliant disposal of all asbestos materials before upgrading the building envelope with new Zincalume Trimdek roof sheeting. New Zincalume box gutters, eaves gutters and downpipes were also installed to improve stormwater management and long-term performance.

Outcome

A Safer, More Durable Facility Delivered On Time for Reopening

The project delivered a new roofing, cladding and drainage system within a constrained shutdown programme. Careful planning, strict asbestos controls and efficient delivery allowed the client to return to operations with a safer, more durable and lower-maintenance facility.

Newly installed roof and wall cladding at an operational facility in Campbelltown

Campbelltown
Frames &
Trusses

Case Study

Location:

Campbelltown

Size:

7,420 m²

Scope:

Asbestos removal, Roof Replacement & Wall Cladding

Challenge

7,420m² Asbestos Replacement Against a Fixed Shutdown Deadline

This large-scale project required the removal and replacement of approximately 7,420m² of asbestos roofing and wall cladding within the Christmas shutdown period. The works needed to be completed safely and efficiently so the site could resume normal operations with minimal delay.

Solution

Compliant Asbestos Removal & Full Roof, Cladding & Drainage Upgrade

R.O. Steel Roofing carried out the controlled removal and compliant disposal of all asbestos materials before upgrading the building envelope with new Zincalume Trimdek roof sheeting. New Zincalume box gutters, eaves gutters and downpipes were also installed to improve stormwater management and long-term performance.

Outcome

A Safer, More Durable Facility Delivered On Time for Reopening

The project delivered a new roofing, cladding and drainage system within a constrained shutdown programme. Careful planning, strict asbestos controls and efficient delivery allowed the client to return to operations with a safer, more durable and lower-maintenance facility.