Licensed Asbestos
Removal
Project: A. W. Edwards Factory
Location: Seven Hills
Size: 6000 m²
At R.O. Steel Roofing, we specialise in asbestos removal and replacement works for commercial and industrial buildings, warehouses, factories, shopping centres, strata and multi-unit buildings.
Our role is to manage the planning, logistics, safety controls and client coordination required to complete works safely, compliantly and with minimal disruption.
Asbestos Removal is only one part of a successful project
the real challenge is safely managing risk, compliance, documentation and client coordination in occupied buildings
At R.O. Steel Roofing, we specialise in asbestos removal and replacement works for commercial and industrial buildings, warehouses, factories, shopping centres, strata and multi-unit buildings.
Our role is to manage the planning, logistics, safety controls and client coordination required to complete works safely, compliantly and with minimal disruption.
What We Do
Asbestos Removal & Roof Replacement Services
Asbestos Roof Replacement

End-to-End Project Management

Safety Planning, Risk Controls & Site Isolation

Pre-Purchase Asbestos Property Inspections

Licensed Asbestos Removal & Disposal

Compliance, Certification & project documentation

Occupied & Operational Site Management

Asbestos Project Quotations

What We Do
Asbestos Removal & Roof Replacement Services
Licenced Asbestos Removal & Disposal

Asbestos Roofing Replacement Systems

Compliance, Certification & project documentation

End-to-End Project Management & Coordination

Occupied Building & Operational Site Management

Safety Planning, Risk Controls & Site Isolation

Asbestos Project Quotations

Pre-Purchase Asbestos Property Inspections

Before Works Commence
Asbestos Project Planning & Risk Management
Successful asbestos removal begins long before materials are removed from site.
Every project presents different risks depending on building occupancy, access constraints, surrounding properties, public exposure, operating requirements and the condition of the asbestos-containing materials.
What We Assess
-
Building occupancy and operational requirements
-
Access and exclusion zone requirements
-
Public and worker exposure risks
-
Waste handling and transportation logistics
-
Environmental and weather-related risks
-
Emergency response procedures
-
Compliance and notification requirements
This planning process allows works to be completed safely while minimising disruption to building occupants, tenants, employees and clients.
We are fully committed to the health and safety of everyone on your premises throughout the project.
Before Works Commence
Asbestos Project Planning & Risk Management
Successful asbestos removal begins long before materials are removed from site.
Every project presents different risks depending on building occupancy, access constraints, surrounding properties, public exposure, operating requirements and the condition of the asbestos-containing materials.
What We Assess
-
Building occupancy and operational requirements
-
Access and exclusion zone requirements
-
Public and worker exposure risks
-
Waste handling and transportation logistics
-
Environmental and weather-related risks
-
Emergency response procedures
-
Compliance and notification requirements
This planning process allows works to be completed safely while minimising disruption to building occupants, tenants, employees and clients.
We are fully committed to the health and safety of everyone on your premises throughout the project.
Safety is critically important to us
Safety, Compliance & Documentation
Asbestos removal is governed by strict legislative and regulatory requirements.
For every project, we prepare a Job Safety and Environmental Analysis (JSEA) and Safe Work Method Statement (SWMS), which are kept onsite throughout the works so safety controls and compliance requirements remain clearly documented and accessible. These documents ensure the works are properly assessed, controlled and carried out in accordance with the relevant SafeWork NSW Code of Practice, Work Health and Safety Act 2011 and WHS Regulation requirements.
Throughout each project, we work closely with licensed air-monitoring specialists to ensure all required documentation, monitoring and certifications are completed and maintained. This ensures every stage of the project is properly planned, documented and independently verified.
How we Manage Projects
Built for Occupied, Operational Sites
01
Working Around Occupied Buildings
We regularly coordinate works around operational and occupied commercial, industrial, warehouse, shopping centres, Strata and multi-unit sites. Through detailed staging, isolation planning and communication with clients, works can often be completed while normal operations continue.
02
Site Isolation & Containment
During asbestos removal works, we implement strict site isolation measures to ensure safety of occupants, workers and surrounding areas. This includes controlled access zones, containment barriers and clear separation between work areas from operational spaces.
03
Independent air monitoring & Clearance
Independent air-monitoring specialists conduct monitoring throughout the removal process to verify that control measures remain effective and asbestos fibres are not released into surrounding occupied areas.
Upon completion of the removal works, final independent air-monitoring clearance checks are carried out. Once clearance certification is issued, occupants are able to access the area allowing normal operations to recommence.
This independent verification process provides assurance that works have been completed in a safe and compliant manner.
04
Complex Project Experience
Large-scale asbestos roof replacements across food manufacturing, Strata and operational industrial sites requiring extensive client coordination.
05
End-to-End Coordination
Where required, we engage and coordinate other trusted contractors and specialist trades - one point of responsibility from start to handover.
Case Studies
Project Showcase
What Customers Say
“Russell and the team did a fantastic job replacing the asbestos roof that we had on our factories. Easy to deal with, the communication was fantastic, and their experience showed through the entire process. What would have been a very stressful project was made easy working with these guys.”
Alexander McWilliam
"They took the time to assist us in selecting the best air vent options to suit our specific needs, offering valuable guidance throughout the process. The job was completed within the agreed timeframe, and the quality of work met the highest Australian standards. We are very satisfied with their professionalism and the end result. Highly recommended!”
Ranjeet Singh
"Russell and his team produced a spectacular result and a quality job. The standard produced was an eye opener for us, making our entire previous work look inadequate."
Peter Vincent
Vincent Developments
Testimonials
Safety is Critically Important to us
Safety, Compliance & Documentation
Asbestos removal is governed by strict legislative and regulatory requirements.
For every project, we prepare a Job Safety and Environmental Analysis (JSEA) and Safe Work Method Statement (SWMS), which are kept onsite throughout the works so safety controls and compliance requirements remain clearly documented and accessible. These documents ensure the works are properly assessed, controlled and carried out in accordance with the relevant SafeWork NSW Code of Practice, Work Health and Safety Act 2011 and WHS Regulation requirements.
Throughout each project, we work closely with licensed air-monitoring specialists to ensure all required documentation, monitoring and certifications are completed and maintained. This ensures every stage of the project is properly planned, documented and independently verified.
How we Manage Projects
Built for Occupied, Operational Sites
01
Working Around Occupied Buildings
We regularly coordinate works around operational and occupied commercial, industrial, warehouse, shopping centres, Strata and multi-unit sites. Through detailed staging, isolation planning and communication with clients, works can often be completed while normal operations continue.
02
Site Isolation & Containment
During asbestos removal works, we implement strict site isolation measures to ensure safety of occupants, workers and surrounding areas. This includes controlled access zones, containment barriers and clear separation between work areas from operational spaces.
03
Independent air monitoring & Clearance
Independent air-monitoring specialists conduct monitoring throughout the removal process to verify that control measures remain effective and asbestos fibres are not released into surrounding occupied areas.
Upon completion of the removal works, final independent air-monitoring clearance checks are carried out. Once clearance certification is issued, occupants are able to access the area allowing normal operations to recommence.
This independent verification process provides assurance that works have been completed in a safe and compliant manner.
04
Complex Project Experience
Large-scale asbestos roof replacements across food manufacturing, Strata and operational industrial sites requiring extensive client coordination.
05
End-to-End Coordination
Where required, we engage and coordinate other trusted contractors and specialist trades - one point of responsibility from start to handover.
Case Studies
Project Showcase
What Customers Say
Testimonials
“Russell and the team did a fantastic job replacing the asbestos roof that we had on our factories. Easy to deal with, the communication was fantastic, and their experience showed through the entire process. What would have been a very stressful project was made easy working with these guys.”
Alexander McWilliam
"They took the time to assist us in selecting the best air vent options to suit our specific needs, offering valuable guidance throughout the process. The job was completed within the agreed timeframe, and the quality of work met the highest Australian standards. We are very satisfied with their professionalism and the end result. Highly recommended!”
Ranjeet Singh
"Russell and his team produced a spectacular result and a quality job. The standard produced was an eye opener for us, making our entire previous work look inadequate."
Peter Vincent
Vincent Developments
FREQUENTLY ASKED QUESTIONS
Yes. R.O. Steel Roofing holds a current SafeWork NSW Non-Friable Asbestos Removal Licence. We manage commercial and industrial asbestos removal and replacement projects, including safe removal, disposal, project coordination and required compliance documentation.
In many cases, yes. We regularly coordinate asbestos works around occupied and operational commercial and industrial sites using detailed staging, isolation planning and communication so normal operations can continue where it is safe and practical to do so.
We implement controlled work areas, site isolation measures, access controls and separation between asbestos work zones and operational areas. Project planning also considers occupancy, public exposure, exclusion zones, waste handling and other site-specific risks.
Yes. Independent air-monitoring specialists conduct monitoring during the asbestos removal process and final clearance checks once removal is complete. Clearance certification is issued before the area is returned to normal access.
Independent asbestos specialists carry out the air monitoring and clearance inspections. We use Airsafe, an independent NATA-accredited asbestos consultancy, to undertake air monitoring during asbestos removal works and provide clearance inspections and certification once the removal is complete.
Contact us with details of the building and proposed works. In many cases, we can identify likely asbestos-containing materials from their type, age and condition, but where there is any uncertainty, we can arrange independent testing to confirm whether asbestos is present.
We will also assess the project requirements, including building occupancy, access, exclusion zones, public and worker exposure, waste handling, environmental conditions and compliance requirements so the works can be properly planned.
Yes. Where required, we can arrange independent NATA-accredited testing through Airsafe to confirm whether roofing, wall cladding or other building materials contain asbestos as part of the project assessment, so we can provide an accurate quotation.
Yes. We provide asbestos roof removal together with replacement roofing systems, allowing removal, reroofing, associated safety controls and project coordination to be managed as part of the overall project.
Yes. Where site operations require it, asbestos roof replacement can be planned around shutdowns, weekends and other agreed out-of-hours periods.
Following asbestos removal, we can install a range of replacement metal roofing and wall cladding systems, including COLORBOND® and ZINCALUME® steel in profiles such as TRIMDEK®, KLIP-LOK® and SPANDEK®.
Depending on the project, works can also include insulation, safety mesh, Ampelite fibreglass sheeting, Danpal polycarbonate systems, skylights or rooflights, ventilation, gutters, downpipes, flashings, cappings and other associated roof and wall components.