top of page

Get in Touch

Discuss Your Project

Request a FREE no-obligation quote and let’s talk about how we can deliver your project safely, on time and to the highest standard.

Servicing Sydney, Central Coast, Newcastle, Wollongong and East Coast NSW.

© 2026 R.O. Steel Roofing | All Rights Reserved

Asbestos roof removal and replacement at the Caroma factory and offices
Project: Caroma Factory & Offices Asbestos Removal & Roof Replacement

Case Study

Caroma
Factory & Offices

Location:

Victoria Road, Wetherill Park

Size:

50,000 m²

Scope:

Asbestos Removal & Roof Replacement

Challenge

50,000m² Reroof With Zero Production Downtime

A key project requirement was maintaining uninterrupted business operations throughout the asbestos removal and reroofing works. 

The facility needed to remain fully operational while extensive asbestos roof replacement was undertaken, requiring careful planning and close coordination with site management to minimise disruption to production and staff while maintaining the highest standards of safety and compliance.

Solution

Nine Months, Weekend-Only Access, Section by Section

This large-scale asbestos reroofing project was completed in carefully planned stages over a nine-month period.


Works commenced during the Christmas shutdown period and continued across weekends when weather permitted, maximising available access while minimising disruption to operations.
Working within a limited window from Friday afternoon to Sunday afternoon, each stage followed strict asbestos removal protocols including pre-internal cover up, continuous air monitoring, asbestos removal, installation of the new roof system, site clean-up, and independent clearance certification before staff re-entered the area allowing production to recommence.


The building was re-roofed using new Colorbond® steel roofing, with new Eureka insulation, fibreglass roof sheeting, ventilation systems, cappings, flashings and gutters installed as part of the complete roof replacement. Each section was fully completed and certified before production recommenced.

Outcome

Fully Operational Throughout, Fully Compliant at Every Stage

Through detailed planning, careful staging and close coordination with site management, the facility remained operational throughout the project. The asbestos roof was safely removed and replaced with a modern, compliant roofing system while maintaining production, minimising disruption to staff and operations, and ensuring the highest standards of safety and compliance were achieved at every stage.

Asbestos roof removal and replacement at the Caroma factory and offices

Caroma
Factory
& Offices

Case Study

Location:

Victoria Road, Wetherill Park

Size:

50,000 m²

Scope:

Asbestos Removal & roof Replacement

Challenge

50,000m² Reroof With Zero Production Downtime

A key project requirement was maintaining uninterrupted business operations throughout the asbestos removal and reroofing works. 

The facility needed to remain fully operational while extensive asbestos roof replacement was undertaken, requiring careful planning and close coordination with site management to minimise disruption to production and staff while maintaining the highest standards of safety and compliance.

Solution

Nine Months, Weekend-Only Access, Section by Section

This large-scale asbestos reroofing project was completed in carefully planned stages over a nine-month period.

Works commenced during the Christmas shutdown period and continued across weekends when weather permitted, maximising available access while minimising disruption to operations.

Working within a limited window from Friday afternoon to Sunday afternoon, each stage followed strict asbestos removal protocols including pre-internal cover up, continuous air monitoring, asbestos removal, installation of the new roof system, site clean-up, and independent clearance certification before staff re-entered the area allowing production to recommence.

The building was re-roofed using new Colorbond® steel roofing, with new Eureka insulation, fibreglass roof sheeting, ventilation systems, cappings, flashings and gutters installed as part of the complete roof replacement. Each section was fully completed and certified before production recommenced.

Outcome

Fully Operational Throughout, Fully Compliant at Every Stage

Through detailed planning, careful staging and close coordination with site management, the facility remained operational throughout the project. The asbestos roof was safely removed and replaced with a modern, compliant roofing system while maintaining production, minimising disruption to staff and operations, and ensuring the highest standards of safety and compliance were achieved at every stage.

bottom of page