Project: NATIONAL STORAGE CROMER METAL Roof Replacement
Case Study
National Storage
Cromer
Location:
Cromer
Size:
7,000 m²
Scope:
Metal Roof Replacement
Challenge
Metal Re-Roof Challenges at a Cromer Commercial Complex
Deliver a 7,000m² metal re-roof across a National Storage facility within a larger commercial unit complex while maintaining safe access and minimising disruption to adjoining tenancies. The project also required structural repairs and upgrades to the site's ageing drainage system.
Solution
Staged Delivery With Full Roof System Replacement
A carefully staged re-roofing program was implemented, including the installation of perimeter guardrails to ensure safe access throughout the works. Existing purlins were repaired and replaced where required before installing new Ausmesh safety mesh, Eureka insulation, Zincalume Trimdek roof sheeting, and fibreglass opal translucent sheeting. New box gutters, COLORBOND eaves gutters, and downpipes were installed to improve stormwater performance, with internal cleaning completed prior to project handover.
Outcome
A High-Performance Commercial Roof Delivered Safely
The completed project delivered a durable, high-performance roofing system that enhanced weather protection, structural integrity, drainage, and natural daylight within the facility. Through careful planning and staged delivery, the works were completed safely and efficiently while maintaining operations across the wider commercial complex.

National
Storage
Cromer
Case Study
Location:
Cromer
Size:
7,000 m²
Scope:
Metal Roof Replacement
Challenge
Metal Re-Roof Challenges at a Cromer Commercial Complex
Deliver a 7,000m² metal re-roof across a National Storage facility within a larger commercial unit complex while maintaining safe access and minimising disruption to adjoining tenancies. The project also required structural repairs and upgrades to the site's ageing drainage system.
Solution
Staged Delivery With Full Roof System Replacement
A carefully staged re-roofing program was implemented, including the installation of perimeter guardrails to ensure safe access throughout the works. Existing purlins were repaired and replaced where required before installing new Ausmesh safety mesh, Eureka insulation, Zincalume Trimdek roof sheeting, and fibreglass opal translucent sheeting. New box gutters, COLORBOND eaves gutters, and downpipes were installed to improve stormwater performance, with internal cleaning completed prior to project handover.
Outcome
A High-Performance Commercial Roof Delivered Safely
The completed project delivered a durable, high-performance roofing system that enhanced weather protection, structural integrity, drainage, and natural daylight within the facility. Through careful planning and staged delivery, the works were completed safely and efficiently while maintaining operations across the wider commercial complex.